SPIN@COSY, Spin Flipping


Collaboration Pages

· SPIN@COSY page, Michigan Spin Center

· SPIN@COSY page, EDDA Bonn (not updated)

SPIN@COSY Proposal

· SPIN@COSY proposal (03/25/03)

· SPIN@COSY proposal (11/16/07)

 


Contributions Teleconferences

 

1. Teleconference 10/24/02

·  COSY Schedule 2003 (preliminary)

·  RF Magnet Design

·  RF Generator

2. Teleconference 11/27/02

·  Parameter RF Dipole (2D simulation)

·  RF Dipole (2D view)

·  RF Dipole (3D view)

·  RF Generator

3. Teleconference 12/18/02

·  COSY Schedule 2003 (approved)

·  Program week 06 (draft)

·  RF Dipole (photo)

·  RF Dipole (measurements)

·  Polarization Modes (ion source)

4. Teleconference 01/22/03

·  RF Dipole (installed)

·  Polarization Modes (ion source)

5. Teleconference 02/26/03

·  Resonance Strength

·  Polarization Modes (ion source)

·  Comparison Integral Fields (RF Dipole / Solenoid)

6. Teleconference 03/13/03

·  Analytical Deviation of Resonance Strength

·  Comparison RF Dipole / Solenoid

7. Teleconference 04/09/03

8. Teleconference 05/15/03

·  COSY Schedule 2003

·  Frequency and width of resonances

·  Data fit (Froissart Stora)

·  RF Frequency step

9. Teleconference 06/11/03

10. Teleconference 07/23/03

·  Ferrite RF Dipole (Mafia simulation)

11. Teleconference 07/30/03

·  Program week 47 (draft)

·  Program week 50 (draft)

12. Teleconference 09/17/03

13. Teleconference 10/20/03

14. Teleconference 11/26/03

15. Teleconference 02/05/04

16. Teleconference 03/15/04

·  Strength of induced spin resonance I

·  Strength of induced spin resonance II

·  Draft-for-COSY-PAC-April-2004

17. Teleconference 04/13/04

18. Teleconference 05/27/04

19. Teleconference 07/01/04

20. Teleconference 07/20/04

·  Spin Preparation in the Injection Beamline

·  Siberian Snake for COSY

21. Teleconference 09/09/04

·  Horizontal Spin Preparation  

22. Teleconference 10/05/04

23. Teleconference 11/04/04

24. Teleconference 11/30/04

25. Teleconference 01/21/05

·  EDDA Target (Schematic View)

·  Vertex Summary (Dec2004 Run)

26. Teleconference 02/17/05

·  Vertex Plots (’03, ’04)

·  IKP Annual Report (Draft)

27. Teleconference 04/07/05

·  Layout and Spin Motion in IBL

28. Teleconference 05/03/05

29. Teleconference 07/06/05

·  Strength of Solenoids

30. Teleconference 07/19/05

 

31. Teleconference 08/09/05

32. Teleconference 10/18/05

·  Remarks to Experimental Tests

33. Teleconference 11/11/05

·  EDDA data acquisition

34. Teleconference 12/14/05

·  Synchrotron-sideband snake resonances

35. Teleconference 01/31/06

36. Teleconference 02/21/06

37. Teleconference 03/23/06

38. Teleconference 04/18/06

·  Spin preparation in IBL

·  Invariant spin axis in COSY

39. Teleconference 05/11/06

·  Spin resonance strength

40. Teleconference 06/21/06

41. Teleconference 07/18/06

42. Teleconference 08/15/06

·  Data analysis on resonance strengths

43. Teleconference 09/21/06

44. Teleconference 10/19/06

45. Teleconference 11/08/06

46. Teleconference 12/14/06

47. Teleconference 01/25/07

·  IKP Annual Report 2006

48. Teleconference 02/22/07

·  RF Solenoid 1

·  RF Solenoid 2

49. Teleconference 03/20/07

50. Teleconference 04/19/07

51. Teleconference 06/21/07

52. Teleconference 07/26/06

53. Teleconference 09/13/07

54. Teleconference 10/11/07

55. Teleconference 11/15/07

56. Teleconference 12/11/07

57. Teleconference 02/07/08

58. Teleconference 03/20/08

59. Teleconference 04/23/08

60. Teleconference 05/15/08

61. Teleconference 06/19/08

·  Source Status

62. Teleconference 07/29/08

·  Q Jump System at COSY

63. Teleconference 09/11/08

64. Teleconference 09/30/08

65. Teleconference 10/28/08

66. Teleconference 11/13/08

67. Teleconference 01/15/09

68. Teleconference 02/12/09

69. Teleconference 03/26/09



http://www.fz-juelich.de/ikp/spinflipping.html


letzte Änderung 26.03.2009 | A. Lehrach | Ausdrucken