JUGENE - Juelicher BlueGene/P



Frequently asked questions

High Message

Planned Maintenance: see High Message

News


22.-24.03.2010 2010 Jülich BlueGene/P Extreme Scaling Workshop
26.-27.11.2009 Introduction to the programming and usage of the supercomputer resources in Jülich
16.11.2009 SIONlib: Scalable I/O library for parallel access to task-local files
26.10. - 28.10.2009 2009 Jülich BlueGene/P Extreme Scaling Workshop
01.09.2009 There will be no refund of CPU time in the case of a failed job!
10.08.2009 Introduction to the programming and usage of the supercomputer resources in Jülich
31.07.2009 PLEASE, submit enough jobs with wall_clock limit < 12 hours to fill empty slots, improve overall utilization of all racks (and your turnaround time)!
14.07.2009 How to allow overlap of communication and computation?
01.07.2009 JUGENE is open for production now
23.06.2009 Two supercomputers from Jülich among the ten fastest in the world
End of June, 2009 Planned start of production of 72 rack JUGENE
26.05.2009 Supercomputing - Made by Jülich
Inauguration of the new Supercomputers
06.04.2009 JUGENE will be out of operation from April 6 until late June, 2009 !!
Blue Gene/P access to sister sites during JUGENE downtime

Access to all data on the fileserver will be available at all times through jump.fz-juelich.de.

12.02.2009 Guide for DEISA/DECI-Users with Home Site FZJ
20.01.2009 Interruptions of JUGENE production due to supercomputer expansion
19.01.2009 LoadLeveler upgraded to V 3.5.0.2, new manual downloaded
02.12.2008 BG/P was upgraded to release V1R3M0, see: Memo to Users
15.10.2008 More Software Packages Available on JUMP and JUGENE
19.09.2008 FAQs and the BG/P Application Development Redbook have been updated
12.08.2008 Presentations from Introduction to programming and using the
IBM supercomputers JUMP and JUGENE
03.06.2008 BG/P was upgraded to release V1R2M0, see: Memo to Users
07.05.2008 Information about filesystem quota limits
22.04. - 24.04.2008 2008 Jülich BlueGene/P Porting, Tuning, and Scaling Workshop
20.02.2008 Presentations about JUGENE given during the NIC Symposium are now available
22.02.2008 Formal inauguration of JUGENE
20.02.2008 NIC Symposium incl. Introduction to JUGENE
18.02.2008 JUBL users may contact dispatch.jsc@fz-juelich.de, or call +49-2461-61-5642 to have their userid enabled on JUGENE.
Jan. 2008 Stabilization of hardware and software is ongoing.
23.11.2007 Foils about indroduction to HPC storage JUST - new storage server with a new using model are available now.
13.11.2007 Allocation of Computing Resources on BG/P
Nov. 2007 Hardware tests and system integration in progress.
Oct. 2007 LINPACK Benchmark shows a performance of 167 Teraflops on 16 racks.
1.10.2007 Installation of BlueGene/P begins.



last change 02.02.2010 | Jutta Docter | Print